DEWA Approvals
DEWA Approvals in Dubai
Any building or construction project in Dubai that needs electricity and water connections, or that affects existing DEWA infrastructure, requires approval from the Dubai Electricity and Water Authority (DEWA). SBM Contracting manages your DEWA NOC and connection process for you, from application through to final connection.
Available Service: DEWA NOC & Connection Approval


Our scope includes:
- 1
Preparation and submission of DEWA NOC and connection applications
- 2
Coordination of load requirements and technical specifications with DEWA
- 3
Preparation and collection of required project documents and drawings
- 4
Submission through DEWA’s online channels and portals
- 5
Follow-up with DEWA to secure NOCs and connection approval
- 6
Coordination of site inspections and meter/connection scheduling
Why Choose SBM Contracting
DEWA approval involves confirming load requirements, technical specifications, and site readiness before a connection or NOC is issued, gaps here mean delays. SBM Contracting takes on that complexity for you.
Frequently Asked Questions
The Dubai Trade Portal is a centralized online platform giving businesses access to services from Economic Zones World, DP World, and Dubai Customs, which streamlines parts of the JAFZA approval process.
An incomplete application can delay or stall your approval. SBM Contracting reviews your documentation in advance to reduce the risk of delays or requests for additional paperwork.
A DEWA NOC (No Objection Certificate) confirms that a construction or building project meets DEWA’s requirements and does not conflict with existing electricity or water infrastructure. It’s typically needed before building permits are finalized or connections installed.
Any property or project requiring a new electricity or water connection, or a change to an existing one, needs approval and coordination through DEWA before the connection can be installed.
Typical requirements include project drawings, technical specifications, load requirement details, and supporting property or ownership documents. SBM Contracting prepares and collects the full set for you.
Timelines depend on the scope of the project, the completeness of the submitted documents, and DEWA’s current processing schedule. Working with an experienced contractor helps avoid delays from incomplete submissions.
Costs depend on the scope of the connection or NOC required, and DEWA’s own authority fees are charged separately from our service fee. Contact SBM Contracting for a clear, upfront quote.
Unapproved connections or work affecting DEWA infrastructure can result in fines, disconnection, or delays while the issue is resolved through proper channels.
Yes. We coordinate site inspections and meter or connection scheduling with DEWA as part of managing your overall application.
Yes. We manage load upgrade applications for existing DEWA connections in the same way we handle new connection approvals, documentation, submission, and follow-up.
A Building NOC confirms a project meets DEWA’s requirements as part of the wider building permit process, while a connection approval is specifically for installing or modifying an electricity or water connection. Projects often need both.
Simply contact our team with your project or property details. We’ll assess what’s needed, confirm the required documents, and manage the process through to your final DEWA approval and connection.