du NOC Approvals2026-10-28T17:58:15+00:00

du NOC Approvals

du NOC Approvals in Dubai

du (Emirates Integrated Telecommunications Company) reviews and approves telecom infrastructure for new buildings and developments before it provides services. Its NOC process covers building design, construction materials, external ducting and site inspection, with handover of the telecom rooms before services go live. SBM Contracting manages your du NOCs and builds the infrastructure to du FTTX standards.

Available Service: du Telecom Infrastructure NOCs

du noc approvals in dubai

Our scope includes:

  • 1

    Design NOC drawings: structured cabling floor and riser layouts, electrical single-line diagram and mobile coverage drawings

  • 2

    Construction and Material NOC submissions, including material samples for testing

  • 3

    OSP and civil infrastructure NOC for external ducting, with master plan and road cross-sections

  • 4

    Installation of telecom rooms, risers, cable containment and FTTX cabling

  • 5

    Booking and attending du site inspections

  • 6

    Snag-free handover of telecom rooms for service activation

Why Choose SBM Contracting

du only takes over telecom rooms that are complete and snag-free, and services start after handover, so late or incomplete NOCs delay occupancy. SBM Contracting manages every du NOC stage alongside construction, so your building is ready on time.

  • Familiar with the du Design, Construction and Material, and OSP NOC stages

  • Telecom, MEP and ELV works under one contractor

  • Inspection timing planned into the construction programme

  • Coordination with Etisalat by e& requirements where both operators are needed

IP phone and laptop on an office desk, illustrating VoIP telephony systems installed by SBM Contracting in Dubai

Get Started

Contact SBM Contracting today to discuss your du NOC requirements and get a clear, upfront quote.

Frequently Asked Questions

What NOCs does du issue for buildings?2026-10-26T16:18:06+00:00

The du process includes a Design NOC, applied for by the consultant, a Construction and Material NOC, applied for by the contractor, and an OSP or civil infrastructure NOC for external ducting, followed by site inspection and handover.

What is checked in the Design NOC?2026-10-26T16:19:06+00:00

du validates the design drawings against its guidelines, including structured cabling floor and riser drawings, the electrical single-line diagram and mobile coverage (GSM) drawings, submitted in AutoCAD and PDF formats with the application form.

What happens in the Construction and Material NOC stage?2026-10-26T16:20:06+00:00

du checks material samples and carries out site inspections while the telecom infrastructure is being installed.

When is the du site inspection requested?2026-10-26T16:21:06+00:00

After the NOCs are obtained and around 70% of the telecom systems are complete, the building inspection is requested online through du.

When must external ducting be handed over to du?2026-10-26T16:22:06+00:00

du asks for external ducting to be handed over at least eight weeks before service is needed.

When will du services be available?2026-10-26T16:23:06+00:00

Once the telecom rooms, customer premises setup and cable containment are snag-free, du takes over the rooms and provides services about 30 working days after handover. Properties should not be occupied before services are available.

Do I also need an e& NOC?2026-10-26T16:24:06+00:00

Many buildings are served by both du and e&, so developers often obtain both NOCs. We coordinate both so the infrastructure meets each operator’s requirements.

How much does a du NOC cost?2026-10-26T16:25:06+00:00

Fees are set by the approving authority or management company and depend on the type and size of the works. We confirm the applicable fees during our initial review and give you a clear quote for our services.

What happens if telecom infrastructure does not meet du standards?2026-10-26T16:26:06+00:00

du will not take over telecom rooms with open snags, so services are delayed until the comments are closed and the rooms pass inspection.

How do I get started with SBM Contracting for my du NOC?2026-10-26T16:27:06+00:00

Call us on +971 43 207 334, email info@sbmtech.com or send your scope and drawings through our contact page. We review the requirements and give you a clear quote and next steps.

Go to Top